The complete production is performed with face hardening and deposition of anti-friction coating instead of imported parts delivery.Hard-face coating on the basis of tungsten carbide (hardness 70 HRC) is applied for face hardening, as anti-friction replacement for bronze coating БрАМц 9-2. Coating is applied by High Velocity Air-Fuel spraying processing. Finishegrinding is performed up to Ra 0,4µm.
The refurbishment of piston-cylinder assembly is performed by reboring technique. Work performed:
– The refurbishment of geometrical dimensions is performed by anti-friction bronze coating in thickness 3 mm;
– Boring of cylinder housing for refurbishment of piston size.
– Refinishing surface roughnesses is Ra 0,8µm.
The complete production is performed with face hardening and applying of coating on basis of tungsten carbide (hard-ness 70 HRC). Coating is applied by High Velocity Air-Fuel spraying processing. Finished grinding is performed up to Ra 0,4µm. Operating life of plungers is increased in 5-7 times in comparison with thermostrengthened steel (40X13) original.
The complete production of steel workpiece is performed with applying of anti-friction coating in thickness 3,0 mm by wire flame spraying technique with subsequent grinding up to Ra 0,8µm.
The complete production with face hardening is performed by hard-face coating on the basis on the tungsten carbide (hardness 70 HRC). Coating is applied by High Velocity Air-Fuel spraying processing. Finished grinding is performed up to Ra 0,4µm. Thickness of coating is 0,2 mm.Plunger have worked 650 hours free from wear instead of 500 hours.
Plunger of high pressure three-throw plunger pump SIGMA PUMPV HRANICE (Czech Republic) (petroleum exploitation by spattering). The complete production with face hardening is performed by hard-face coating on the basis on the tungsten carbide (hardness 70 HRC). Coating is applied by High Velocity Air-Fuel spraying processing. Finished grinding is performed up to Ra 0,4µm. Thickness of coating is 0,2 mm.